1. For Pani ZED™ View, the plant configuration is 100% defined by the user, so no data is needed other than any manual report forms you wish to duplicate on the platform.
2. For Pani ZED™ Focus, we do need to connect your data/PLC to the platform, and if desired, some historical data to load into the system to power historical reports from day 1.
3. For Pani ZED™ Guide and Consult implementations, we require P&ID diagrams, PLC/Sensor tables, historical data and potentially data sheets for various equipment pieces in order to create and power the digital models used for simulation.